Preparation: New Surfaces should be completely dry. Brush or Scrape off all defective paint or powdery residues. Treat mould growth with an appropriate bleaching solution. Prime with one coat roof shield thinned with 20% water.
Application: Apply 2 coats after priming by Brush or Roller. Do not thin.
Coverage: 12 sq.m./lt. (128 sq.ft./lt.)