Preparation and application: Make sure the surface is sanded to the required smoothness. If coated with stain make sure to sand with high grade sand paper to achieve a much smoother finish. Apply 2 coats of Exterior Top Coat (AZ 32xx/85) to achieve the final premium finish.
Drying Time: 1 – 4 hours between coats
Recommended Coverage: 90 – 125 grams/sq.m.